Starting on Jan. 20, new stop signs and supporting infrastructure will be installed at the intersections of La Rue Road with Garrod Drive and Bioletti Way, converting them into all-way stops.
Fall quarter is almost here! Plan for increased traffic and parking congestion as students return to campus. Between September 17 and 27, several events and activities will impact key parking facilities and surrounding areas.
On Thursday, May 16, campus began work on the Pavilion Parking Structure to restrict public vehicle and pedestrian access to levels 5 and 6 of the structure. Fencing will be installed on the ramps, elevators will no longer stop at levels 5 and 6 and the stairwell above the 4th floor will be locked. These levels will now only be accessible to campus-authorized vehicles.
Bikes are a fairly normal thing in Davis, that doesn’t mean we shouldn’t take time to lift them up and celebrate them. May is National Bike Month, established in 1956 by the League of American Bicyclists, and continues locally as we celebrate 20 years of May is Bike Month with our pals at Sacramento Area Bicycle Advocates (SABA).