Fall instruction starts on Wednesday, September 24, and we expect increased traffic and parking congestion in the first few days of the quarter. Consider adjusting your regular commute (telework, bus, bike, carpool) and check this page for parking structure and lot fill status updates between 8 a.m. and 12 p.m. View map of parking facilities here.
Additionally, there are some ongoing construction projects that will strain traffic flow in some areas:
Hutchison Drive
- Between Health Sciences Drive and La Rue Road – Both roadway directions reduced to one travel lane.
- Between Bioletti Way and the Teaching and Learning Center – The sidewalk on the south side of Hutchison Drive is closed. Follow the detour signs.
North Quad
- Between A Street and East Quad – Fully closed to vehicles and carts. Extensive detour for pedestrians and bikes. Please heed the signage. Additional, higher volume detour available south of Young Hall. Please be aware that vehicle traffic on A street does NOT stop at the intersection of the Young Hall Bike Path and A Street.
West Quad
- At the Coffee House – The sidewalk on the east side of West Quad, immediately adjacent to the CoHo will be closed for construction. Please follow any detour signage.
Parking Lot 25 Bike Path
- Bike Path South of Lot 25 – The pedestrian path is closed while a construction project finishes up. Please follow detour signage to the temporary walkway within the bike path.
Mondavi Area
- Mrak Hall Drive & Old Davis Road – This traffic signal is on all-way-stop/blinking red while repair parts are sourced. Please be patient and considerate of all users when traveling through this area.
Parking Structure and Lot Fill - Day 3 (September 26)
Last Updated: 12:00 PM - Final Update
- Quad Parking Structure: 80%
- Pavilion Parking Structure: 65%
- Gateway Parking Structure: 25%
- Lot 1: 40%
- Lot 2: 75%
- Lot 5: 95%
- Lot 5A: 50%
- Lot 10: 60%
- Lot 14: 85%
- Lot 25: 90%
- Lot 30: 60%
- Lot 35: 70%
- Lot 41: 40%
- Lot 47: 65%
Traffic Insights:
None to note.
Parking Structure and Lot Fill - Day 2 (September 25)
Last Updated: 12:00 PM - Final report until we report Quad and Pavilion have sufficient space again (see below).
- Quad Parking Structure: Not full @ 2pm.
- Pavilion Parking Structure: 85% @ 1:30pm.
- Gateway Parking Structure: 45%
- Lot 1: 45%
- Lot 2: 90%
- Lot 5: Full. Go to Gateway Parking Structure.
- Lot 5A: 95%.
- Lot 10: 95%.
- Lot 14: Full. Go to Lot 30 or Pavilion Parking Structure.
- Lot 25: Full. Go to Lot 30.
- Lot 30: 75%
- Lot 35: 70%
- Lot 41: 80%
- Lot 47: Full. Go to Gateway Parking Structure.
Traffic Insights:
None to note.
Parking Structure and Lot Fill - Day 1 (September 24)
Last Updated: 12:00 PM (Final Update for the Day)
- Quad Parking Structure: 90% @ 1pm. Final-final update.
- Pavilion Parking Structure: 85% @ 1pm. Final-final update.
- Gateway Parking Structure: 80%
- Lot 1: 80%
- Lot 2: 80%
- Lot 5: Full. Go to Gateway Parking Structure.
- Lot 5A: 95%
- Lot 10: Full. Go to Lot 5A or Gateway Parking Structure.
- Lot 14: Full. Go to Lot 30, Pavilion Parking Structure, or Gateway Parking Structures.
- Lot 25: Full. Go to Lot 30, Pavilion Parking Structure, or Gateway Parking Structures.
- Lot 30: 70%
- Lot 35: Full. Go to Lot 30.
- Lot 41: 80%
- Lot 47: Full. Go to Gateway Parking Structure.
Traffic Insights: